{"id":798,"date":"2023-08-11T15:10:38","date_gmt":"2023-08-11T15:10:38","guid":{"rendered":"https:\/\/greenscontractors.co.uk\/?p=798"},"modified":"2023-08-11T16:38:45","modified_gmt":"2023-08-11T16:38:45","slug":"shed-base-in-wetherby","status":"publish","type":"post","link":"https:\/\/greenscontractors.co.uk\/projects\/shed-base-in-wetherby\/","title":{"rendered":"Shed Base in Wetherby"},"content":{"rendered":"\n

Client<\/strong>: Shed base
Location<\/strong>: Wetherby
Duration<\/strong>: Week<\/p>\n\n\n\n

Greens Contractors were tasked with the removal of the existing topsoil, subsoil and limestone to create an area for a new shed along side the existing ones.<\/p>\n\n\n\n

Works included the removal of the existing top soil, sub soil and limestone base, this work was carried out using our Case CX130D<\/strong> with the R4 Rototilt<\/strong>.<\/p>\n\n\n