Client: Private Client
Location: Huby
Duration: Week

Greens Contractors were tasked with creating a pond for a domestic client.

Works included the removal of the existing top soil, sub soil and sand base, the pond was then shaped to the clients requirements using the Case Cx130D with the R4 Rototilt. A perforated pipe was installed at the base of the pond to prevent water build up under the lining, as well as an overflow pipe which would keep the pond at the required level.
The pond lining was then installed by Sean Carr Lining Technology.

We back filled around the edge of the pond as well as reinstating a small amount of the garden.