Client: Shed base
Location: Wetherby
Duration: Week

Greens Contractors were tasked with the removal of the existing topsoil, subsoil and limestone to create an area for a new shed along side the existing ones.

Works included the removal of the existing top soil, sub soil and limestone base, this work was carried out using our Case CX130D with the R4 Rototilt.